Vessel Shell Fabrication
Large cylindrical vessel shells are fabricated and assembled in the workshop.
From workshops, tank fabrication and active-part assembly to factory inspection and delivery preparation, real production photographs illustrate our manufacturing capabilities.
Photographs grouped by manufacturing stage show electrostatic desalter projects from vessel fabrication and system integration to factory inspection.
Large vessels during fabrication and assembly, before coating and final equipment integration.
Vessels, operating platforms, piping and dedicated transformers are integrated into a complete equipment package.
Auxiliary systems and the inspection work carried out before equipment leaves the factory.
Workshop processes show how steel plate is cut, welded into structures and surface-treated before final assembly.
Steel plate is cut to the required component shapes, ready for forming and fit-up.
These photographs document manufacturing processes. Final tank structure, coating system and accessories are governed by approved drawings and project specifications.
Follow the manufacturing sequence from windings and active parts to tank assembly, inspection and delivery.
A controlled supplier pool covers core materials, structural parts, voltage-regulation and protection components, and monitoring instruments. Manufacturers, brands and models are selected according to project specifications and approved documents.
Transformer insulating oil; copper wire, copper strip and winding conductors.
Core materials and complete cores; transformer tanks and associated steel structures.
Tap changers; project-matched varistors and overvoltage-protection components.
Pressure-relief valves, oil-level gauges, temperature switches, pressure switches and level switches.
Component manufacturers are confirmed during engineering review; equivalent alternatives require technical approval.
Discuss Components & Project Requirements